
Prairie Energy Partners finalising refinery location
Prairie Energy Partners is working to finalise the location of its proposed next-generation crude refinery, which would combine pure oxygen with blue and green hydrogen.
Stay up to date with the latest news and updates from the hydrogen industry.

Prairie Energy Partners is working to finalise the location of its proposed next-generation crude refinery, which would combine pure oxygen with blue and green hydrogen.

Development will begin in early 2023, and will see LINE Hydrogen design, develop, and operate renewable technologies at the site to replace fossil fuel-based power generation.

Solaris has been awarded an order by ZTM Lublin to supply the city’s first hydrogen bus. The Urbino 12 hydrogen bus is a vehicle featuring state-of-the-art solutions based on hydrogen technology.

KEME Energy’s project in Sines has secured a €2.4 million POSEUR grant and will be developed in 2023 using Fusion Fuel’s HEVO-Solar technology.

Powered by renewable hydroelectricity, the electrolyser system will split water into oxygen and green hydrogen. Detailed design work and system integration are underway, with plans to bring the Niagara Hydrogen Centre online in early 2024.

James Cross, AMETEK Land, UAE, discusses how to improve reliability and productivity in steam cracker and steam methane reformer (SMR) operations.

Opex/Hevolucion, a Colombian systems integrator of batteries and hydrogen fuel cells, and Avia Ingeniería, a Spanish electric powertrain provider and systems integrator, are both looking to trial hydrogen-electric vehicles in 2023.

NGT and NOGAT have become the first pipeline owners to receive the Certificate of Fitness for the transport of green hydrogen through their existing pipelines in the North Sea.

SIAD MI has received valuable recognition as a 'Master Supplier' from Cryoinfra – a leading Mexican company in the production and distribution of industrial gases.

The green hydrogen will be used to produce fertilizers, melamine and technical nitrogen at Borealis operations in Linz, Austria. The electrolysis plant is scheduled to commence operations in 2025, with projected annual CO2 emissions reductions of up to 90 000 t.

The grant is for accelerating advanced PEM electrolyser stack development, to enable low-cost hydrogen storage and resiliency applications, in collaboration with the Engineer Research and Development Center- Construction Engineering Research Laboratory (ERDC- CERL).

Progressive Energy Ltd has appointed Kent to develop a FEED design to deliver hydrogen at the correct specification and availability for Cadent’s proposed Hydrogen Village project in the UK.